Project Scheduler (Hybrid Option)

Carlsbad, NM
Full Time
Experienced
UDR is seeking qualified candidates for a Project Scheduler (Hybrid Option) opportunity for our customer in Carlsbad, NM to support the Waste Isolation Pilot Plant (WIPP).

Per diem is available for those who qualify.
Work Location: On-Site at WIPP. A hybrid schedule of up to 50% remote may be considered.
Citizenship: United States Citizenship Required

The Waste Isolation Pilot Plant (WIPP) is the nation’s only permanent nuclear waste repository for defense-generated transuranic (TRU) waste generated from Department of Energy (DOE) sites across the country. Waste is permanently isolated over 2,000 feet underground in deep salt beds.

Job Description:
Provide support to the WIPP projects in the development, analysis, and control of project schedules in support of program goals and objectives. Provide assistance in the development and maintenance of integrated, resource loaded schedules utilizing fundamental critical path method techniques within an earned value management system. Provide direct assistance in developing and maintaining for multiple departments.

Duties may include but are not limited to:
• Day to day utilization of Primavera P-6 to perform schedule development and schedule studies within a network environment
• Develop ad hoc reports and scenarios to support program objectives
• Analyze schedule data for baseline change control, variance analysis, horizontal and vertical coordination, and integration of schedule logic
• Align baseline activities with daily implementation activities
• Coordinate changes to project baseline cost and schedule documents.
• Analyze a variety of cost and schedule information and resolve related problems.
• Meet with on-site technical experts, review existing documentation, and interface with personnel to gain the specific information needed to establish, status and analyze project schedules.
• Coach and lead on-site technical experts, as necessary, to gain the required information for project schedules.
• Provide written and oral information to others in work group and assigned work units in other departments. Make formal presentations to small groups in own and other departments.
• Effectively coach and mentor others on EVMS principles, including report layouts, calendars for routine deliverables, and procedures or desk top guides on scheduling processes

Qualifications:
• Understanding of planning and control principles, techniques and prescribed system criteria.
• 5-20+ years of experience in the development and maintenance of integrated resource loaded schedules wherein the skills and abilities to perform the position’s duties and accountabilities have been adequately demonstrated
• 5-20+ years of demonstrated experience utilizing Primavera with extensive experience utilizing Primavera P6
• Desired experience in a DOE operational/project environment
• Desired experience using Earned Value Management systems within the DOE complex in accordance with DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets and EIA-748, Earned Value Management Systems
• Desired experience in the development and maintenance of integrated resource loaded schedules for operational readiness activities
• Desired experience in the development and maintenance of integrated resource loaded schedules for capital asset and general plant projects
• Experience leading/directing Plan of the Day/Week/Month meetings
• Knowledge of Microsoft Excel and COBRA software preferred
• Previous WIPP experience is a plus


UDR Consulting, INC is a Service-Disabled Veteran-Owned, Woman-Owned, Minority-Owned, Small Disadvantaged Business.  An Equal Opportunity Employer that considers all qualified applicants for employment without regard to race, color, religion, sexual orientation, gender identity, national origin, protected Veterans, or individuals with disabilities.  UDR also supports a drug-free work environment.

UDR offers highly competitive salaries and employee benefit packages structured to best suit your needs. We offer multiple individual and family benefit options including paid time off, medical, dental, life, vision, and disability insurance, and a pre-tax 401 (k) retirement account with Company matching contributions and 100% vesting for eligible participants beginning DAY 1.

https://udrconsultingincorporated.applytojob.com/apply/ 








 
Share

Apply for this position

Required*
Apply with Indeed
We've received your resume. Click here to update it.
Attach resume as .pdf, .doc, .docx, .odt, .txt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file

To comply with government Equal Employment Opportunity and/or Affirmative Action reporting regulations, we are requesting (but NOT requiring) that you enter this personal data. This information will not be used in connection with any employment decisions, and will be used solely as permitted by state and federal law. Your voluntary cooperation would be appreciated. Learn more.

Invitation for Job Applicants to Self-Identify as a U.S. Veteran
  • A “disabled veteran” is one of the following:
    • a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or
    • a person who was discharged or released from active duty because of a service-connected disability.
  • A “recently separated veteran” means any veteran during the three-year period beginning on the date of such veteran's discharge or release from active duty in the U.S. military, ground, naval, or air service.
  • An “active duty wartime or campaign badge veteran” means a veteran who served on active duty in the U.S. military, ground, naval or air service during a war, or in a campaign or expedition for which a campaign badge has been authorized under the laws administered by the Department of Defense.
  • An “Armed forces service medal veteran” means a veteran who, while serving on active duty in the U.S. military, ground, naval or air service, participated in a United States military operation for which an Armed Forces service medal was awarded pursuant to Executive Order 12985.
Veteran status



Voluntary Self-Identification of Disability
Voluntary Self-Identification of Disability Form CC-305
OMB Control Number 1250-0005
Expires 04/30/2026
Why are you being asked to complete this form?

We are a federal contractor or subcontractor. The law requires us to provide equal employment opportunity to qualified people with disabilities. We have a goal of having at least 7% of our workers as people with disabilities. The law says we must measure our progress towards this goal. To do this, we must ask applicants and employees if they have a disability or have ever had one. People can become disabled, so we need to ask this question at least every five years.

Completing this form is voluntary, and we hope that you will choose to do so. Your answer is confidential. No one who makes hiring decisions will see it. Your decision to complete the form and your answer will not harm you in any way. If you want to learn more about the law or this form, visit the U.S. Department of Labor’s Office of Federal Contract Compliance Programs (OFCCP) website at www.dol.gov/ofccp.

How do you know if you have a disability?

A disability is a condition that substantially limits one or more of your “major life activities.” If you have or have ever had such a condition, you are a person with a disability. Disabilities include, but are not limited to:

  • Alcohol or other substance use disorder (not currently using drugs illegally)
  • Autoimmune disorder, for example, lupus, fibromyalgia, rheumatoid arthritis, HIV/AIDS
  • Blind or low vision
  • Cancer (past or present)
  • Cardiovascular or heart disease
  • Celiac disease
  • Cerebral palsy
  • Deaf or serious difficulty hearing
  • Diabetes
  • Disfigurement, for example, disfigurement caused by burns, wounds, accidents, or congenital disorders
  • Epilepsy or other seizure disorder
  • Gastrointestinal disorders, for example, Crohn's Disease, irritable bowel syndrome
  • Intellectual or developmental disability
  • Mental health conditions, for example, depression, bipolar disorder, anxiety disorder, schizophrenia, PTSD
  • Missing limbs or partially missing limbs
  • Mobility impairment, benefiting from the use of a wheelchair, scooter, walker, leg brace(s) and/or other supports
  • Nervous system condition, for example, migraine headaches, Parkinson’s disease, multiple sclerosis (MS)
  • Neurodivergence, for example, attention-deficit/hyperactivity disorder (ADHD), autism spectrum disorder, dyslexia, dyspraxia, other learning disabilities
  • Partial or complete paralysis (any cause)
  • Pulmonary or respiratory conditions, for example, tuberculosis, asthma, emphysema
  • Short stature (dwarfism)
  • Traumatic brain injury
Please check one of the boxes below:

PUBLIC BURDEN STATEMENT: According to the Paperwork Reduction Act of 1995 no persons are required to respond to a collection of information unless such collection displays a valid OMB control number. This survey should take about 5 minutes to complete.

You must enter your name and date
Human Check*